AOG Parts and Release Certificates: FAA 8130-3 and EASA Form 1

What the paperwork travelling with an AOG part has to show, from FAA Form 8130-3 to EASA Form 1 and dual release, before the flight leaves.
Technician inspecting a boxed aircraft component in a hangar before it is loaded

An AOG part is only useful on arrival if its release certificate travels with it. For US-released parts that is usually FAA Form 8130-3. For European parts it is EASA Form 1. Before the flight leaves, Elysium Jet asks you to confirm that the certificate travels with the part. The paperwork comes from you and your maintenance provider, and a flight without it does not end the AOG.

Why the release certificate is the first question

The fastest delivery of a part that nobody can install is a flight for nothing. Indeed, the engineer at the aircraft will not fit a part whose airworthiness they cannot establish. Instead, the aircraft stays on the ground while someone finds the paperwork and sends it on.

So before an AOG flight departs, the first question is not how fast it can go. It is whether the part can go onto the aircraft the moment it lands. The answer then depends on three things: the release certificate itself, whether it suits the registry, and the records behind it. This page explains each one in plain terms, so you can ask before the part leaves the shelf. For the flight itself, see our page on AOG charter flights for aircraft parts.

Release certificate types at a glance

Generally, three documents cover most of the parts we fly. Each one comes from a different authority, but they all do the same basic job.

SystemDocumentWho signs itTypical use on an AOG part
United States (FAA)FAA Form 8130-3FAA-authorized persons, production approval holders, certificated repair stationsNew-part airworthiness approval, export approval, return to service after maintenance
Europe (EASA)EASA Form 1Part 21 production organisations, Part-145 maintenance organisationsRelease of new parts, component release after maintenance
Canada (Transport Canada)Form One, the Authorized Release CertificatePersons and organisations approved under the Canadian Aviation RegulationsNew and used products other than complete aircraft

FAA Form 8130-3: what the tag does

The form carries a long official name: Authorized Release Certificate, Airworthiness Approval Tag. FAA Order 8130.21J, dated 25 September 2025, specifically explains how authorized persons complete it under Part 21. For example, the form records an airworthiness approval for a new engine, propeller or article from a production approval holder. It also serves as an export airworthiness approval, and as a production approval holder’s own authorized release document.

After maintenance, a certificated repair station can use the same form to approve a part for return to service. The FAA covers that use in AC 43-9, Maintenance Records, rather than in the Part 21 order. As a result, an 8130-3 on an AOG part may describe a new item or an overhauled one.

Two limits matter on the day. First, the order says the form does not approve installation on a particular aircraft. Instead, it helps the end user determine the item’s approval status. Also, the form cannot serve as a delivery or shipping document. So the shipment still needs its own transport paperwork, and the tag travels alongside it.

The installer decides, not the tag

In the US system, the 8130-3 is the common evidence, but not the only one. FAA Advisory Circular 20-62E instead puts the responsibility on the installer. Before returning the aircraft to service, the installer has to determine that the part is eligible for installation.

For a used part, records that meet 14 CFR 43.9 can identify it. Moreover, the AC states that no set form exists for a maintenance record. However, those records must trace back to a person authorized to approve the work. The AC also warns that distributors without a production approval cannot certify the airworthiness of the parts they sell. In practice, the 8130-3 is the quickest way for a receiving engineer to see that status. That is why we ask about it.

EASA Form 1: the European release certificate

In the European system, EASA Form 1 serves as the authorised release certificate. A production organisation approved under Part 21 issues it for new parts and appliances, under point 21.A.163(c). After maintenance, a Part-145 organisation issues it as the component’s certificate of release to service, under point 145.A.50(d). In both cases, the form then follows the part.

The European rules also tie installation more directly to the form than the FAA guidance does. Point 21.A.307 makes a new part eligible for installation when three things hold. It must be in a condition for safe operation, marked, and accompanied by an EASA Form 1. Then, for aircraft maintained under Part-M, point M.A.501 sets the installation test. A component goes onto an aircraft only in satisfactory condition and released on an EASA Form 1 or equivalent. However, standard parts and raw materials follow their own conditions. Both texts sit in the EASA Easy Access Rules for Part 21 and for Continuing Airworthiness.

The narrow exception in Part-145

Part-145 contains one exception written for exactly this situation. It applies when an aircraft sits away from its main line station or main maintenance base. The cause has to be that no component with the appropriate release certificate is available there.

In that case, the contracted maintenance organisation may fit a component temporarily. Even so, it needs the agreement of whoever manages the aircraft’s continuing airworthiness. The limit is 30 flight hours or the aircraft’s first return to its main base, whichever comes first. It must still carry a suitable release certificate and meet every other maintenance and operational requirement. Above all, that call belongs to the maintenance organisation and the continuing airworthiness manager, never to the flight.

Transport Canada Form One

Canada uses its own document, the Authorized Release Certificate, known as Form One. Transport Canada Standard 571 points to its Appendix J for completing the form. Appendix J covers new and used aeronautical products other than complete aircraft. A maintenance release on a Form One also follows the same logic as the FAA and EASA forms. The part arrives with a signed statement from an approved person who stands behind its condition.

Dual release: when one release certificate is not enough

Problems start when the part and the aircraft sit under different authorities. For instance, an aircraft on one registry may not accept a part released only under the other system. The answer, in many cases, is a dual release: one form that carries the release statements of both systems.

Under the EU-US aviation safety agreement, EASA requires a dual release on FAA Form 8130-3 for used engines and components. That applies when they come from a US repair station. New parts follow a different path, because EASA accepts them released new on the 8130-3 under the agreement’s technical procedures. EASA’s answer on dual release sets this out.

The reverse case exists too. The FAA-EASA Maintenance Annex Guidance, Change 9 of October 2024, covers EU maintenance organisations that also hold FAA approval. They can issue an EASA Form 1 with a dual release. That form ticks both regulatory statements and also adds an FAA return-to-service statement. The same guidance also covers a common trap. Sometimes an assembly contains a sub-part released under only one system. Its final release must then say the assembly suits only aircraft on that system’s registry.

For an AOG, the practical point is simple. A part can land on time and still be unusable because its release fits the wrong registry. Your maintenance provider knows what the aircraft’s authority accepts, so ask before the part leaves.

Traceability beyond the release certificate

The release certificate is the headline document, but it is rarely the only one the engineer wants. For example, FAA guidance lists the records worth obtaining for a used part. They include airworthiness directive status, service bulletin compliance, and life-limited part history with times and cycles. They also include shelf-life data, the return-to-service date and any import or export certification.

Rotable units, which move between aircraft and overhaul shops, often need that history most. Block 12 of the 8130-3 also helps here. FAA Order 8130.21J uses it for remarks that help the user or installer judge airworthiness. Compliance with airworthiness directives or service bulletins is one example. So when an AOG repair answers an airworthiness directive, check that the records show the configuration it requires.

Four release certificate failures that keep an aircraft down

Most paperwork problems we hear about fall into four patterns. A check before departure can catch each one.

  • Your certificate stays behind at the warehouse, and the part flies without it.
  • The part number or serial number on the form does not match the part in the box.
  • Its release comes from one system, while the aircraft’s authority requires the other.
  • A copy arrives where the receiving organisation expects the original.

Each one keeps an aircraft on the ground after the part has already landed. The last one has a nuance, though. FAA Order 8130.21J allows electronic signatures and lets an issuer send copies. However, the issuer must mark each one clearly as a copy or duplicate. Whether a copy is enough for installation is for the receiving organisation to say, so ask in advance.

How the paperwork travels on an Elysium Jet flight

Paperwork travels in one of two ways: packed with the part, or carried by a technician on board. Either way, it goes on the aircraft with the part at pickup and reaches the grounded aircraft with it. When the repair needs hands as well, we can fly the part and the technician together.

Size matters too, because the packed dimensions decide which aircraft can carry the part. Abroad, one more point helps. FAA Order 8130.21J notes that installing an item on a US-registered aircraft outside the United States is not an export. The item never leaves the US civil aviation system. However, customs clearance of the part is a separate matter, and it belongs to you. Our page on an aircraft AOG abroad covers that case.

Who does what

Responsibilities split three ways. You and your maintenance provider supply the part and its paperwork. The certificated maintenance personnel responsible for the aircraft carry out the installation and the return to service. Elysium Jet asks whether the certificate travels with the part. Then we arrange the flight with a certificated air carrier.

We do not, however, inspect, certify or release parts. Nothing on this page replaces the judgment of the engineer who signs for the work.

Frequently asked questions

What is an 8130-3?

FAA Form 8130-3 carries the title Authorized Release Certificate, Airworthiness Approval Tag. It documents the airworthiness approval status of a part produced or maintained under the US system. It helps the installer, but it does not by itself approve installation on a particular aircraft.

What is an EASA Form 1?

EASA Form 1 serves as the authorised release certificate in the European system. Approved production organisations issue it for new parts, and Part-145 maintenance organisations issue it after component maintenance. European rules generally require it, or an accepted equivalent, before a component goes onto an aircraft.

Can an engineer fit a part without its release certificate?

Under EASA rules, generally not: point M.A.501 requires an EASA Form 1 or equivalent, with limited exceptions. Under FAA rules, the installer must establish eligibility, and the 8130-3 is the usual evidence. Other compliant records can also serve. Either way, the receiving engineer decides.

What is dual release?

A dual release is one release document that carries the statements of two authorities, typically the FAA and EASA. EASA requires it for used engines and components from US repair stations under the EU-US agreement. Ask your maintenance provider whether the aircraft’s registry needs it.

Why does Elysium Jet ask about the paperwork?

Because a flight that delivers a part nobody can install does not end the AOG. Confirming the release certificate before departure costs one question. Finding it missing after landing can cost another flight and another day on the ground.

How to request a quote

Send the part number, packed dimensions and weight, pickup point and aircraft location. Confirm, too, that the release certificate travels with the part. The quote desk runs 24/7 and returns a written quote within 10 minutes with three aircraft options. Call New York on +1 (929) 529-7339, Dubai on +971 54 703 1414 or Europe on +33 6 88 26 83 22, or use the contact page. Elysium Jet is a charter broker; certificated air carriers operate every flight.

Last verified: 2026-10-12 against FAA Order 8130.21J, FAA AC 20-62E, the EASA Easy Access Rules for Part 21 and for Continuing Airworthiness (Part-M, Part-145), the EASA dual release FAQ, the FAA-EASA Maintenance Annex Guidance Change 9 and Transport Canada Standard 571. Re-check whenever the FAA revises Order 8130.21 or AC 20-62, or EASA amends Part-M or Part-145.

Archive Posts

Elysium Jet: Where Vision Meets Private Aviation

Make a request

A private jet costs between 4000 to 10 000 USD per hour