Landing permission for a charter flight rests on three gates that an aircraft’s performance charts never answer. The charts show whether the aeroplane can physically use a runway. Then the State decides what the airfield accepts. The operator’s certificate decides where that company may fly, and the pilot needs the qualification the field demands. A charter lands only when all three gates are open, so Elysium Jet checks each one before you book.
Why performance is not landing permission
An aircraft flight manual answers one question: can this aeroplane, at this weight and temperature, get into and out of this runway? However, it says nothing about whether a paying passenger may fly there. A charter carries passengers for payment, so it counts as commercial air transport. That adds a legal layer on top of the physics.
The layer starts with the Chicago Convention. Under Article 5 of the Convention, aircraft on non-scheduled flights may fly into another contracting State without prior permission. But a flight that carries passengers for hire stays subject to that State’s own regulations, conditions or limitations. In the United States, 14 CFR 119.5 goes further. Nobody may operate as an air carrier or commercial operator without an appropriate certificate and operations specifications.
So the same aeroplane, on the same runway, can be legal for its owner and closed to a charter. Elysium Jet is a charter broker, and certificated air carriers operate every flight we arrange. As a result, every sector we sell has to clear all three gates of landing permission, not just the performance check.
The three gates of landing permission
Each gate has a different holder, and each can close for a different reason. In practice, we treat them as a checklist for every airport on a routing.
| Gate | Who holds it | What closes it |
|---|---|---|
| Aerodrome status | The State and the aerodrome operator | Restricted use, mass or type limits, or a per-type authorisation for commercial flights that the operator lacks |
| Operator approval | The holder of the air operator certificate or Part 135 certificate | An airport, procedure or aircraft type outside its approvals, for example a steep approach or a short landing |
| Crew qualification | The individual pilot | No mountain rating, site authorisation, local briefing or aerodrome familiarisation, so the crew cannot fly in |
The gates are independent. An open runway does not open the operator’s approvals. Likewise, an approved operator still needs a pilot with the right qualification for that field on the day.
Gate one: the State and the aerodrome
Landing permission starts with the State, because it decides what traffic an airfield admits. It also publishes those conditions in its aeronautical information. France, for example, lists its altiports in the French AIP as restricted-use aerodromes, each with its own conditions. Mass and type limits sit here too. Courchevel’s altiport accepts only propeller aircraft up to 5.7 tonnes and helicopters, so no jet qualifies, whether private or for hire.
Gate two: the operator’s approvals
An operator may fly only where its certificate and approvals allow. In Europe, the EASA air operations rules make steep approaches subject to prior approval in commercial air transport. That applies to glideslope angles of 4.5 degrees or more. Short landing operations need prior approval too. In the United States, the same idea works through operations specifications. Under 14 CFR 119.5, a Part 135 operator may fly in an area only if its operations specifications allow it.
EASA’s guidance also asks every operator to sort the aerodromes it uses into categories A, B and C. Category C covers fields that need extra consideration. It also covers fields where the local authority requires simulator instruction or a visit before a crew operates there. There is no single EASA list of Category C aerodromes. Instead, each operator lists its own Category B and C fields in its operations manual.
Gate three: the pilot’s qualification
The last gate is personal. At French altiports, aeroplane pilots need the mountain rating or a valid access authorisation for that altiport. Samedan, the airport for St Moritz, requires every pilot to pass a familiarisation briefing and test before flying in. That certificate stays valid for two years. Sion requires a local qualification for instrument flights. Type A comes through an online module, while Type B covers approaches with minima below 8,000 ft.
Innsbruck shows how the pilot gate links back to the operator. The Austrian AIP makes familiarisation with adequate briefing material mandatory there. Crews must also practise on site in good weather, or in a flight simulator, before flying those approaches in low cloud. The threshold is a 3,000 ft ceiling and 5 km visibility. Under EASA’s guidance, that kind of requirement is exactly what places a field in Category C.
Courchevel: landing permission at an altiport
Courchevel shows all three gates at once. The French AIP lists the altiport as a restricted-use mountain airfield with a single runway of 536 metres. Its steepest section has a slope of 18.66 per cent. Aeroplanes must land uphill on runway 22 and take off downhill on runway 04. Night VFR has no approval there, and flights from outside the Schengen area may not use it.
For a jet, landing permission at Courchevel fails at gate one. The AIP reserves the field for propeller aircraft with a maximum take-off mass of 5.7 tonnes, and for helicopters. Single-engine aeroplanes above 2.5 tonnes and all twins also need a file lodged with DSAC Centre-Est, the regional civil aviation directorate.
Gates two and three follow. Public transport by aeroplane needs the operator’s own approvals first. Then DSAC Centre-Est must authorise each aircraft type, on the basis of a file of procedures and limitations. Meanwhile, the pilot needs the mountain wheel rating or a valid access authorisation for the altiport.
The result is simple: no jet lands at Courchevel. Instead, the jet flies to a gateway, and a helicopter or the road covers the last leg. By road, the Courchevel tourist office gives 95 km and about 1h15 from Chambéry. From Geneva International Airport, it gives 179 km and about two hours. It also says the altiport accommodates certain private and commercial flights. Under the AIP, those can only be helicopters and propeller aircraft up to 5.7 tonnes.
Gstaad-Saanen: an airfield in the valley
Gstaad tops the Knight Frank Alpine Property Report 2026 as the costliest Alpine resort, and it has an airfield in its own valley at Saanen. That proximity leads many travellers to assume a jet charter can simply land there. However, performance only answers the first question.
The airport’s pilot information describes an uncontrolled field at 3,284 ft. It warns of a relatively short landing runway, nearby obstacles and a non-standard traffic pattern. Every take-off and landing needs an online prior-permission request, which also carries the customs declaration and the airport briefing. So even a private flight there starts with the airport’s consent.
For a charter, landing permission at Saanen turns on gate one, and published material does not settle it. The airport publishes its briefing and procedures, but not a statement of which commercial flights it admits in each aircraft class. So for a fixed-wing leg into Saanen, we plan on a turboprop such as the PC-12. Then we confirm the arrangement with the airport in writing before booking. We do not offer a jet charter into Saanen without that written confirmation.
The road gives a firm fallback. Gstaad’s tourist office gives about 1h30 by car from Bern Airport and about two hours from Geneva Airport. A helicopter transfer is the other option, and we price it as a separate leg.
Lukla: landing permission that takes years to earn
Tenzing-Hillary Airport at Lukla, the airstrip that serves the Everest region, shows gate three at its strictest. Nepal’s AIP gives a runway of 527 by 20 metres at 9,337 ft, with an 11.7 per cent upslope. Aircraft take off on runway 24 and land on runway 06.
Nepal’s Civil Aviation Authority lists Lukla first among the Category C airfields in its flight operations requirements, which call them altiports. Before that, a pilot must clear the Category B step. It takes at least 100 STOL missions and 12 months at Category B or C fields, counted after a CAAN airline transport licence.
Then come an additional 150 missions at Category C fields. On multi-engine aeroplanes, the pilot also needs at least 2,500 hours and 18 months since upgrading to captain. Finally, the pilot earns each Category C airfield after ten missions there and an instructor pilot’s check on the eleventh.
Those requirements take years of flying in Nepal to meet. So for Lukla, a jet takes the party to Kathmandu, and the last leg goes with a local operator whose pilots already hold the clearance. At Lukla, landing permission belongs to the crew as much as to the aircraft, and our job is to join the two legs into one plan.
Why an owner can land where a charter cannot
Private flying still passes gate one and gate three. The aerodrome’s limits apply to everyone, and so do pilot qualifications such as the French altiport access rules. Gate two is where landing permission splits between private and commercial flights, because commercial air transport carries extra approvals and stricter operating rules.
France’s accident investigation bureau, the BEA, describes that gap in a report on a 2024 PC-12 accident at Courchevel. The operator flew under the non-commercial NCO rules of the EU air operations regulation. According to the BEA, those rules are more flexible than the CAT rules for commercial transport. That gap shows in management systems, written procedures and crew qualification. In addition, the report notes that no European requirement covers altiport access, which France sets nationally.
The steep approach approval follows the same logic. It sits in the commercial air transport rules. So a charter operator needs it, on the aircraft type, before flying such an approach for hire. That is why an owner flying privately can sometimes reach a field that a charter company cannot sell a single seat into.
How we turn a closed gate into a complete journey
When landing permission fails for the jet, the answer is not a car at the airport door. Instead, the jet flies to the nearest gateway that passes all three gates. Then a helicopter, a propeller aircraft or the road covers the rest, and the aircraft legs fly under an operator’s certificate just like the jet.
- Courchevel: jet to Chambéry or Geneva, then a helicopter to the altiport or a car up the valley.
- Gstaad: jet to Bern or Geneva, then a helicopter or a car, while any fixed-wing leg into Saanen waits for written confirmation.
- St Moritz: the exception, because the municipality of Samedan describes an airport 5 km from St Moritz that aircraft up to medium-weight jets can use all year.
- Lukla: jet to Kathmandu, then a local operator whose crews hold the clearance.
We price each leg separately in the quote, because each one means a different aircraft, a different operator and a different price. For the jet leg, our published hourly rate bands give a first estimate. For the helicopter side, our guide to heli-ski trips by private jet shows how the two legs fit together. Our page on planning a ski trip by private jet covers the wider season.
Questions we put to the operator about landing permission
- Does the airport admit a commercial flight on this aircraft type, and do you hold any authorisation it requires?
- Do your approvals cover the procedure in use, such as a steep approach or a short landing?
- How does your operations manual categorise the field, and is the crew current on it?
- What payload and fuel does performance allow on the day, at that elevation and temperature?
- Where does the aircraft park, or must it reposition?
We put the answers in writing before booking, so the landing permission for each leg is clear before anyone commits. For permits along the way, our page on permit lead times by destination explains the timing. Our guide to charter safety checks also covers how we review operators.
Frequently asked questions
What is landing permission for a charter flight?
It is the sum of three separate approvals, not one document. First, the State and the aerodrome must admit the flight. Next, the operator’s certificate and approvals must cover the airport and the procedure. Finally, the pilot must hold any qualification the field requires, while performance charts only show that the aircraft can use the runway.
Can a private jet land at Courchevel?
No. The French AIP reserves the altiport for propeller aircraft with a maximum take-off mass of 5.7 tonnes and for helicopters. So the jet flies to a gateway such as Chambéry or Geneva, and a helicopter or the road covers the last leg.
Why can an aircraft owner land where a charter cannot?
Because a charter is commercial air transport, it needs approvals that private flying does not. In Europe, for example, a steep approach in commercial air transport needs prior approval from the authority. The aerodrome’s own limits and the pilot’s qualifications still apply to the owner, though.
Does a steep approach need special landing permission?
For a commercial flight in Europe, yes. EASA’s rules require prior approval from the competent authority for steep approaches at 4.5 degrees or more. Short landing operations need prior approval too. The operator holds that approval for the aircraft type, and the crew trains for it.
Can a charter jet land at Gstaad-Saanen?
We do not offer one without written confirmation from the airport. Saanen requires a prior-permission request for every take-off and landing. Its published material does not say which commercial flights it admits in each aircraft class. So we plan a turboprop, a helicopter or the road, and confirm it in writing before booking.
How do you reach Lukla by private jet?
The jet flies to Kathmandu, and an operator whose pilots hold the Lukla clearance flies the last leg. Nepal’s Civil Aviation Authority requires years of local experience before that clearance. It ends with ten missions into the airfield and an instructor check on the eleventh.
Who checks landing permission before we book a charter?
The operator confirms its approvals and crew qualifications, and the airport confirms its own conditions. Elysium Jet collects those answers alongside the written quote. Where an airport requires written confirmation, we obtain it before booking.
How to request a quote
Send the resort or airport, the dates, the number of passengers and the luggage, including skis. Our checklist of what we need to quote a charter covers the rest. The quote desk runs 24/7 and returns a written quote within 10 minutes with three aircraft options. Call New York on +1 (929) 529-7339, Dubai on +971 54 703 1414 or Europe on +33 6 88 26 83 22, or use the contact page. Elysium Jet is a charter broker; certificated air carriers operate every flight.
Last verified: 2026-10-15 against the Chicago Convention (ICAO Doc 7300/9), 14 CFR 119.5, the EASA Easy Access Rules for Air Operations (Revision 24), the French AIP for Courchevel, the BEA, the Austrian AIP, the Gstaad, Samedan and Sion airport publications, the Courchevel and Gstaad tourist offices, the CAAN flight operations requirements and Nepal’s AIP. Re-check each airport’s conditions before every season, and confirm Saanen in writing for each booking.
