Where can a turboprop go that a jet cannot?

Some airfields are shut to jet charter but open to certificated turboprops and helicopters. How the per-class access matrix works at Courchevel, Méribel, St Barth and beyond, and how we build the two-leg trip.
Helicopter on a snowy altiport where a turboprop goes and a jet cannot land

A turboprop goes where a jet cannot when the airfield draws its line by aircraft class rather than by performance. Courchevel’s altiport, for example, admits only propeller aircraft of 5.7 tonnes or less, plus helicopters. St Barth carries a 5.7-tonne pavement limit, and both fields add a type-by-type authorisation for commercial flights. So we sell the arrival in two legs. A jet flies to the gateway, then a certificated turboprop or helicopter flies the last stretch on its operator’s certificate.

Where a turboprop goes: three answers per airfield

An airfield does not have a single charter answer. Instead, it can have three, because jets, turboprops and helicopters face separate rules. At the hardest fields, the turboprop and the helicopter stay open while the jet stays out. Where a turboprop goes, a helicopter often goes too, but the jet stops at the gateway. So we read every field as a small matrix rather than a yes or no.

StateWhat it means for a charter
AvailableCommercial flights in this class use the field routinely
ConditionalPossible only when the operator holds a named approval for the type, so we confirm it in writing before booking
Not availableNo commercial flight in this class, whatever the aircraft can physically do

Performance charts answer one question: can this aircraft get in and out of that runway? They say nothing about whether anyone may sell the flight. A charter is commercial air transport, so three further gates apply. First, the State sets the airfield’s legal status. Then the operator needs approval for the field and the type. Finally, the individual pilot needs the right qualification.

Where a turboprop goes in the French Alps: Courchevel

Courchevel shows all three gates on one chart. France’s aeronautical information service publishes the visual approach chart for Courchevel, and it reserves the altiport for two groups. Propeller aircraft with a maximum takeoff mass of 5.7 tonnes or less qualify, and so do helicopters. As a result, a turboprop of 5.7 tonnes or less goes in, while no jet can use the field.

The runway itself is short and steep. The altiport’s own page gives 537 by 40 metres, with a slope of up to 18.5%. It sits at 2,007 metres above sea level. On the chart’s profile, the steepest section reaches 18.66%. Landings use Runway 22 and departures use Runway 04, and the altiport’s local rules also prohibit night flights.

The operator and pilot gates at Courchevel

Even when a turboprop goes under the 5.7-tonne line, it needs two more approvals before anyone can sell a seat. Under the chart, public transport by aeroplane requires the approvals of the operator’s own authority. It also requires an authorisation from DSAC Centre-Est, the regional safety directorate, based on a file for each aircraft type. In addition, single-engine aeroplanes above 2.5 tonnes and all twins must file their procedures with the same office.

The pilot gate comes on top. Aeroplane pilots need a mountain wheel rating or a valid altiport access authorisation. Helicopters, by contrast, may use the field without restriction. So at Courchevel, we read the matrix as jet not available, turboprop conditional and helicopter available.

One more line on the chart shapes the whole trip: it does not authorise non-Schengen flights. So a party from London or Dubai first clears immigration at a Schengen gateway, such as Geneva, Chambéry or Lyon. In addition, a flight from a Schengen country outside the EU, such as Switzerland, needs 24 hours’ notice for customs. Only then does the party take the last leg up the valley.

Méribel, where no turboprop goes commercially

Méribel goes further than Courchevel. The national list of restricted-use aerodromes bars aeroplanes on commercial air transport flights from the altiport, with narrow exceptions. It remains open to helicopters. So no turboprop goes into Méribel on a commercial flight, and the last commercial leg is a helicopter.

Megève adds a winter detail. Its chart says that after snowfall the runway stays packed rather than cleared, and it does not authorise non-Schengen flights. Our page on heli-ski trips by private jet covers how a helicopter leg fits a mountain itinerary.

Where a turboprop goes in the Caribbean: St Barth

St Barth works on the same logic with different numbers. The aerodrome entry in the French AIP calls the pavement low-strength. It sets a maximum takeoff load of 5.7 tonnes and a maximum tyre pressure of 0.9 MPa. The AIP also prohibits takeoffs on Runway 28 and night landings on either runway.

Commercial flights face a second gate. Only authorised operators may fly public air transport by aeroplane to or from St Barth. The authorisation comes from the civil aviation safety director for the French West Indies and French Guiana. It covers each aeroplane type or class separately, and the application goes in at least 60 days before operations start. The rules sit in the arrêté of 21 July 1972, last amended in April 2026.

The pilot gate follows. Each pilot needs a proficiency recognised by an instructor before serving the aerodrome. It stays valid only if the pilot has used the aerodrome at the controls within the previous six months. For a French air operator certificate holder, the authorisation runs as long as that certificate. Other operators receive it for three years at most. So a turboprop goes into St Barth on an existing authorisation, because a new one takes at least 60 days.

Virgin Gorda: no jet by rule, so the turboprop goes in

In the British Virgin Islands, the rule appears in plain words. The Governor’s Instruction VG 003 for Virgin Gorda (Taddy Bay) allows fixed-wing flights only by propeller-driven aeroplanes. Those aeroplanes must also meet the scheduled take-off and landing performance criteria. Flights run by day only, in visual conditions. They also need the BVI Airports Authority’s prior permission, sought at least two hours before departure.

The operator gate follows. Each operator needs whatever approval its own national authority requires. If necessary, that authority adds Virgin Gorda as a special airport in the operator’s operations specifications. A commercial captain needs at least 1,500 hours in total and 50 hours on the type or class. The captain also needs ten previous landings at the aerodrome. In addition, the take-off distance multiplied by 1.25 must fit the take-off run available. So at Virgin Gorda, the jet stays out by rule, and a turboprop goes in on its operator’s approvals.

Saba, where a turboprop goes only with written permission

Saba’s runway is 400 metres long and 20 metres wide, according to the Dutch aerodrome designation regulation of July 2020. The aerodrome serves only civil air traffic that the Minister of Infrastructure and Water Management has permitted in writing. The minister can also attach conditions. Helicopters, by contrast, need no such permission. Take-offs and landings also stop from 15 minutes after sunset until sunrise, except for emergencies and search and rescue.

So every aeroplane, turboprop included, goes in on a written permission, while the helicopter does not need one. That makes Saba a clear case of separate answers for each class.

When a single-engine turboprop goes at night or in cloud

Many of the aircraft that fit these limits have one engine. For example, the Pilatus PC-12/47E’s EASA type-certificate data sheet gives a maximum take-off mass of 4,740 kg. That sits inside Courchevel’s 5.7-tonne line. However, it also puts the aircraft in the group that must file a case with DSAC Centre-Est.

In Europe, a single engine adds one more gate, and the EASA air operations rules set it. In commercial air transport, single-engined turbine aeroplanes may fly at night or in instrument conditions only with a SET-IMC approval. Without it, the operator may not fly a single-engined aeroplane at night or in instrument conditions, except under special VFR. So before a PC-12 leg goes into our quote, we ask whether the operator holds SET-IMC. Otherwise, winter cloud can hold the last leg on the ground.

The pilot gate at its hardest: Lukla

Nepal shows how far the pilot gate can reach. The Civil Aviation Authority of Nepal’s flight operations requirements class Lukla among its Category C airfields, the altiports. Before that stage, a captain must hold a Nepalese airline transport pilot licence. Then come at least 100 short take-off and landing missions and 12 months at Category B or C airfields.

Next come 150 further missions at Category C airfields. A captain clears each of those airfields only after ten missions there, with an instructor’s check on the eleventh. Nepal’s AIP also gives Lukla a 527 by 20-metre runway with an 11.7% upslope. So we plan the Lukla leg with a Nepal-based operator whose captains already hold that record.

How the whole journey stays on an operator’s certificate

At Courchevel or Méribel, the product is not a jet plus a car at the airport door. Instead, it is a jet to the gateway, then commercial air transport for the rest of the way. Each leg flies on its own operator’s certificate, with its own crew and its own approvals. So when the turboprop goes the last stretch, it does so under its own operator’s authorisation for that field.

We quote the legs separately because they are different aircraft, different operators and different prices. Hiding the last leg inside one number is what makes a quote collapse later. We also confirm the operator’s type authorisation for the last leg in writing before we book it. Our guide to private jet safety explains how to read an operator’s certificate.

On water: the floatplane leg runs by day

The same logic runs on water. The Maldives Civil Aviation Authority’s water aerodrome rules say their certification criteria cater for day, visual flight rules operations only. So in the Maldives, we plan the floatplane connection around daylight, and our Maldives routes guide covers the transfer options.

Estimate, October 2026. Turboprop class, at our published hourly rates of roughly USD 2,000 to 3,200. When the last leg goes by turboprop, the two-hour minimum that most operators apply sets the floor. That comes to roughly USD 4,000 to 6,400 for a short leg. This is an estimate for illustration, not a quote. Landing fees, handling, permits and taxes are additional, and a helicopter leg carries the helicopter operator’s own price.

Frequently asked questions

Can a private jet land at Courchevel?

No. The official chart admits only propeller aircraft of 5.7 tonnes or less, plus helicopters. So a jet lands at a gateway such as Geneva, Chambéry or Lyon. The last leg then goes by helicopter or by an authorised turboprop.

Can a turboprop charter fly into Courchevel?

Only conditionally. A turboprop goes in only if it fits the 5.7-tonne line. The operator also needs an authorisation from DSAC Centre-Est for that aircraft type. The pilot needs a mountain rating or an altiport access authorisation, too. So we confirm all three in writing before booking.

Can I fly straight from London to Courchevel?

No. The Courchevel chart does not authorise non-Schengen flights, and the United Kingdom sits outside Schengen. So the party clears immigration at a Schengen airport first, then continues by helicopter or turboprop.

Can a jet fly into Virgin Gorda?

No. The Governor’s instruction for Virgin Gorda allows fixed-wing flights only by propeller-driven aeroplanes that meet its performance criteria. Flights also run by day only, in visual conditions, with the airport authority’s prior permission.

Why does St Barth need 60 days’ notice for a new operator?

Because the French authority authorises commercial operators type by type. An operator applies at least 60 days before it starts flying a new type there. That is why we use operators that already hold the authorisation for the aircraft we quote.

Why do you price the last leg separately?

Because it is a different aircraft, a different operator and a different price. A separate line keeps the quote honest. It also lets you compare a helicopter with a turboprop where both are possible.

What does conditional mean in your access matrix?

It means the flight is possible only when the operator holds a named approval for that field and type. We ask for that approval in writing before we confirm the booking, rather than assuming it.

How to request a quote

Send your dates, passenger count, departure city and final destination, not just the nearest airport. Our checklist of what we need to quote a charter covers the rest. The quote desk runs 24/7 and returns a written quote within 10 minutes with three aircraft options. Call New York on +1 (929) 529-7339, Dubai on +971 54 703 1414 or Europe on +33 6 88 26 83 22, or use the contact page. Elysium Jet is a charter broker; certificated air carriers operate every flight.

Last verified: 2026-10-15 against the French AIP and visual approach charts (cycle of 1 October 2026), the list of restricted-use aerodromes on Légifrance, the arrêté of 21 July 1972 on Saint-Barthélemy, the Courchevel altiport’s own pages, BVI Governor’s Instruction VG 003, the Dutch Saba aerodrome regulation of 2020, the EASA air operations rules and PC-12 type-certificate data sheet, the CAAN flight operations requirements and Nepal AIP, and the Maldives water aerodrome rules. Re-check every chart and authorisation rule before each season, and confirm each operator’s type authorisation in writing.

Archive Posts

Elysium Jet: Where Vision Meets Private Aviation

Make a request

A private jet costs between 4000 to 10 000 USD per hour